netconf-0----Page:4
1  2  3  4  5  6  7  8  9  10  11  12 

Operator Requirements
OPS area has been researching NM requirements for almost 2 years
April, 2001 – May 2002 OPS-NM Road show visits Operators at RIPE, NANOG, LISA
June, 2002 IAB Workshop on Network Management
Several drafts have been written on the subject
Operator Requirements of Infrastructure Management Methods
(expired)
Overview of the 2002 IAB Network Management Workshop
(-02 missed the I-D cutoff)
Concepts and Requirements for XML Network Configuration

On Transport of Configuration Information

PPT Version