
|
Operator Requirements OPS area has been researching NM requirements for almost 2 years April, 2001 – May 2002OPS-NM Road show visits Operators at RIPE, NANOG, LISA June, 2002 IAB Workshop on Network Management Several drafts have been written on the subject Operator Requirements of Infrastructure Management Methods Overview of the 2002 IAB Network Management Workshop Concepts and Requirements for XML Network Configuration On Transport of Configuration Information |