
|
Howlround in Standards A positive feedback loop exists Increasing pressure on time to market is speeding up the cycle time Vendors deploy specifications at PS as if they are fully matured To avoid damage to our reputation, we have responded by trying to make PS specifications ready for prime time Results in baked-in problems |