mobike-2----Page:6
1  2  3  4  5  6  7 

Connectivity assumptions
I assume that A and B do not have full connectivity information in advance
Partial or unreliable information may be available
This includes messages between A and something else than B
Full information requires a message pair between A and B
This has to be an IKEv2 message
Unless we modify ESP (IMHO we should not)
Either an existing or new message type
PPT Version