dtnrg-3----Page:14
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  31  32  33  34  35  36  37  38  39  40  41 

Delivered Bundles Vs. Path Distance Run at 20% Target Availability: Random Link Dynamics
Every node was allowed to source or sink traffic.

Bulk of the offered load was from 4-hop and 5-hop traffic. The baseline case is not challenged by this load since the random link dynamics admits such paths.

Note however that baseline performance would have dropped significantly if the offered load did not include any 4-hop traffic.
PPT Version