
|
DOCSIS Submissions 2 DOCSIS Event Notification MIB Draft –03 discussed at the interim meeting Draft –04 will incorporate minor comments from interim meeting This draft requires in-depth WG review DOCSIS 2.0 RFI MIB Draft –05 discussed at the interim meeting Draft –06 incorporated comments from interim meeting Module name needs to revert to DOCS-IF-MIB This draft requires in-depth WG review DOCSIS QoS MIB Draft –07 reviewed in depth at the interim meeting Draft –08 incorporated extensive comments from interim meeting DOCSIS 1.1/2.0 QoS protocols supports IP ToS instead of DSCP |