SNA NAU Services MIB (snanau) Charter
NOTE: This charter is accurate as of the 37th IETF Meeting in San Jose. It
may now be out-of-date. (Consider this a "snapshot" of the working
group from that meeting.) Up-to-date charters for all active working
groups can be found elsewhere in this Web server.
Chair(s)
- Bill Kwan <billk@jti.com>
Network Management Area Director(s):
- Deirdre Kostick <kostick@qsun.att.com>
Mailing List Information
- General Discussion:snanaumib@cisco.com
- To Subscribe: snanaumib-request@cisco.com
- Archive: ftp://ftp.cisco.com/snanaumib/mail-archive
Description of Working Group
The SNA NAU MIB Working Group is chartered to define a set of managed
objects for SNA Network Accessible Units. These includes PUs(Physical
Units) such as type 2.0 and 2.1 and LUs(Logical Units) such as type 1,
2, 3, and 6.2. These objects will be the minimum necessary to provide
the ability to monitor and control those devices, providing fault,
configuration, and performance management, and will be consistent with
the SNMP framework and existing SNMP standards.
The working group has completed the MIBs for base SNA NAU functions and
advanced functions for LU Type 6.2 or APPC (Advanced Program-to-Program
Communication). With the exception of the current work in enhancing the
SNA NAU MIB, the focus of the working group will be developing two
additional MIBs for managing APPN (Advanced Peer-to-Peer Networking)
and HPR (High Performance Routing) nodes.
The working group will make sure that its work is aligned with the SNA
DLC MIB Working Group, due to the close relationship between the
devices being worked on by the two groups.
Goals and Milestones
- Done
- Begin discussion of proprietary MIBS and develop a single proposal.
- Done
- Post an Internet-Draft of the SNA NAU Services MIB.
- Done
- Submit the SNA NAU Services MIB to the IESG fo consideration as a Proposed Standard.
- Done
- Post proprietary MIB modules.
- Done
- Develop and post a single proposal for structure of the MIB module.
- Done
- Meet at IETF to review proposed structure/walk through.
- Done
- Post Internet-Draft of the APPC MIB.
- Done
- Post second Internet-Draft of APPC MIB.
- Done
- Meet at IETF to review MIB (if necessary).
- Done
- Achieve concensus on the final Internet-Draft.
- Mar 96
- Post Internet-Draft of the APPN MIB.
- Mar 96
- Update Internet-Draft of SNA NAU MIB with corrections and changes reflecting implementation experiences.
- Apr 96
- Submit the APPC MIB Internet-Draft to the IESG for consideration as a Proposed Standard.
- Apr 96
- Submit revised APPN MIB to as an Internet-Draft.
- May 96
- Achieve consensus on the new SNA NAU MIB Internet-Draft.
- Jun 96
- Submit APPN MIB Internet-Draft to IESG for consideration as a Proposed Standard.
- Jun 96
- Post Internet-Draft of HPR MIB.
- Jul 96
- Submit the SNA NAU MIB Internet-Draft to the IESG for consideration as a Proposed Standard.
- Jul 96
- Submit revised HPR MIB as an Internet-Draft.
- Aug 96
- Submit HPR MIB Internet-Draft to IESG for consideration as a Proposed Standard.
Current Internet-Drafts
Request for Comments