Done | | Submit first draft of PCE architecture document |
Done | | Submit first draft of PCE discovery requirements and protocol
extensions documents |
Done | | Submit first draft of the PCE communication protocol
requirements |
Done | | Submit first draft of the definition of objective metrics |
Done | | Submit first draft of the PCE communication protocol
specification |
Done | | Submit PCE architecture specification to the IESG to be
considered as Informational RFC |
Done | | Submit first draft of the MIB module for the PCE protocol |
Done | | Submit PCE communication protocol requirements to the IESG to
be considered as an Informational RFC |
Done | | Submit PCE discovery protocol extensions specifications to the
IESG to be considered as a Proposed Standard |
Done | | Submit PCE communication protocol specification to the IESG to
be considered as a Proposed Standard |
Jun 2008 | | Submit first draft of applicability statement (describing the
processes and procedures for the use of the PCE architecture,
protocols and protocol extensions for inter-area MPLS and GMPLS
Traffic Engineering) |
Done | | Submit first draft of the PCE P2MP communication requirements |
Done | | Submit first draft of the PCE P2MP PCEP protocol extensions |
Sep 2008 | | Submit PCE P2MP communication requirements to the IESG to be
considered as an Informational RFC |
Nov 2008 | | Submit applicability statement to the IESG as informational RFC |
Dec 2008 | | Submit PCE P2MP PCEP protocol extensions to the IESG to be
considered as an Proposed Standard RFC |
Feb 2009 | | Submit the PCE MIB Internet-Draft to the IESG for consideration
as Proposed Standard |
Done | | Submit applicability and metrics documents to the IESG |
Feb 2009 | | Evaluate WG progress, recharter or close |