I am the assigned Gen-ART reviewer for this draft. For background on Gen-ART,  please see the FAQ at Document: draft-ietf-straw-b2bua-loop-detection-04 Reviewer: Wassim Haddad Review Date: 23 Apr 2014 IETF LC End Date: 25 Apr 2014 IETF Telechat Date: 24 Apr 2014 Summary: This draft is ready to be published as proposed standard Major Issues: None Minor Issues: none Regards, Wassim H.