General tidying-up
Closer alignment with DiffServ MIB and PIB
- terminology (which is correct? - other drafts need to change)
- “counter” or “monitor”? “discarder” or “algorithmic dropper”?
Structure
- shapers: still some residual text that treates these as Actions, not part of Queuing -> clean this up
- move most of the discussion stuff from MIB to Model
- Fred’s n x 2-port = n-port router discussion from 3.1 to Hierarchical Model 3.2
- Meter discussion from 3.3 to Meters 5.1
- Kwok’s RED discussion from 3.4 to Discarders 7.1.3
- Kwok’s Queuing example from 3.5 to Schedulers 7.1.2