This Working Group did not meet
Last Modified: 2003-08-18
Done | Meet at the 41st IETF to discuss implementation experience of RFC 2108 and RFC 2239, and to consider future extensions for Full Duplex operation and 1 Gigabit Ethernet Speeds | |
Done | Gather implementation experience feedback concerning RFC 2108 and RFC 2239 | |
Done | Post Internet-Draft(s) for Full Duplex and 1 Gigabit Ethernet MIB extensions | |
Done | Meet at the 42nd IETF to discuss the Internet-Draft(s) and issue recomendations concerning advancement of RFC 2108 and RFC 2239 on the standards track | |
Done | Post revised Internet-Draft(s) | |
Done | Conduct WG Last Call on Internet-Draft(s) | |
Done | Submit final version of the Internet-Draft(s) to the IESG for consideration as Proposed Standards | |
Done | Submit revised version of the Internet-Drafts, following the Area Directorate review | |
Done | Submit final versions of the MAU MIB and Ethernet-like Interfaces MIB Internet-Draft(s) to the IESG for consideration as Proposed Standards | |
Done | Submit the Ethernet Chipsets document to IESG for consideration as an Informational RFC | |
Done | Begin identifying new work items for future work | |
Done | Issue WG Drafts for MIBs for P802.3ae & P802.3af | |
Done | Issue revised WG Drafts for MIBs for P802.3ae/P802.3af | |
Done | Gather implementation experience concerning WG documents already on the standards track | |
Done | WG Last Call All documents | |
Done | Issue revised WG drafts for existing stds track documents if so required by the implementation reports | |
Done | Forward Internet-Drafts to the AD/IESG Stds track considerations | |
Done | Power Ethernet MIB Last Call | |
Done | Submit Power Ethernet MIB to AD/IESG for Standards track consideration |