This Working Group did not meet
Last Modified: 2003-07-30
Done | Submit the initial protocol encapsulations as working group Internet-Drafts. | |
Done | Submit initial version of framework document as an Internet-Draft. | |
Done | Discuss drafts and issues at the IETF meeting in San Diego. | |
Done | Discuss framework, specification and related drafts (e.g., MIBs, discovery) for the protocol encapsulations at IETF meeting in Minneapolis. | |
Done | Submit final version of iSCSI requirements draft to the IESG for consideration as Informational RFC. | |
Done | Submit initial Internet-Draft of FCIP/iFCP common encapsulation format | |
Done | Begin revision of WG charter in consultation with the Area Directors. | |
Done | Meet at IETF meeting in London to discuss specification and related drafts (e.g., MIBs, discovery) for the protocol encapsulations | |
Done | WG Last Call on IPS security considerations document. | |
Done | WG Last Calls on iSCSI, iSCSI naming/discovery, and iSCSI MIB. | |
Done | WG Last Calls on all WG drafts intended to be published as RFCs, except NAA naming draft | |
Done | Submit remaining non-MIB protocol drafts intended to be published as RFCs to IESG, except NAA naming draft | |
Done | Revise iSCSI boot draft to address security issues and submit to IESG | |
Done | Determine whether to advance NAA naming draft for publication as an RFC in consultation with Technical Committee T10 | |
Jul 03 | Submit all remaining MIB drafts to IESG. | |
Aug 03 | Submit draft on iSCSI ordering considerations for SCSI commands to IESG for consideration as Informational. | |
Done | Submit NAA naming draft to IESG for publication as an RFC if appropriate | |
Sep 03 | Review with ADs what (if any) additional work the WG should undertake. |