This Working Group did not meet
Last Modified: 2003-03-11
Done | Submit Internet-Draft on significantly low bandwidth links. | |
Done | Submit Internet-Draft on significantly lossy links. | |
Done | Submit Internet-Draft on long-thin networks (based on draft-montenegro-pilc-ltn-01.txt) submitted to the IESG for publication. | |
Done | Draft of link-layer design considerations document. | |
Done | Draft of PEP capabilities and limitations document. | |
Done | Draft on asymmetric network paths. | |
Done | Document on lossy links to IESG for publication as BCP. | |
Done | Document on PEP capabilities and limitations submitted for publication as Informational. | |
Done | Document on low bandwidth links to IESG for publication as BCP. | |
Done | Draft of TCP Over Wireless document to the IESG as BCP | |
Done | Document on link-layer design considerations submitted for publication as BCP. | |
Done | Document on asymmetric network paths submitted to the IESG for publication as BCP. |