isis-6----Page:3
1  2  3 

Most Recent Changes
Separate the OL, PT, ATT bits for default topology and other topologies
Added some text for ensuring routing consistency when using MT, such as the route leaking should only be performed within the same MT
Emphasize in MT IS TLV, Prefixes TLV, MT-ID zero must be ignored
Emphasize not to mix TLV type 236 and 237 for IPv6 in the same network
Fixed some typos

PPT Version