Agreed work items/DP status
DP1: Referring to Sets of Meetings.
Agreement: Should be inherently supportable with “cloning tree“ structure and iCal (i.e. should not impact current/planned iCal functionality).
Action: Need to ensure that there is a single “time” from which other times are derived (subject to system considerations).
DP2: Floor Control Model in terms of “Groups of RTP streams”?
Agreement: go forward based on mailing list feedback that grouping may not be necessary (i.e. can use a stream name specific to a “role”. )
Validate approach by working through further detailed flows, etc. with protocols (in section 7).