Done | | Post Internet-Draft for Entity MIB. |
Done | | Post updated Entity MIB Internet-Draft. |
Done | | Submit final version of Internet-Draft for consideration as a
Proposed Standard. |
Done | | Finalize scope of changes/augmentations to RFC 2037 |
Done | | Post updated/new Internet Drafts |
Done | | Reach agreement on changes/extensions to RFC 2037 |
Done | | Evaluate status of RFC 2037 and report to the IESG if it should
be recycled at Proposed or can be elevated to Draft Standard. |
Done | | Submit Internet Draft containing Entity MIB Extensions to IESG
for consideration as a Proposed Standard. |
Done | | Evaluate status of Entity MIB and collect implementation and
interoperability reports |
Done | | Recommend to the IESG if Entity MIB can be elevated to Draft
Standard. |
Done | | Post Internet-Draft for Sensor Entity MIB |
Done | | Determine if the Entity MIB should be modified to resolve any
open issues |
Done | | Submit final version of Internet-Draft for Sensor Entity MIB
for consideration as a Proposed Standard |
Done | | Re-cycle the updated Entity MIB at proposed standard, if
necessary |
Done | | Submit final version of Internet-Draft for Sensor Entity MIB
for consideration as a Proposed Standard |
Done | | Post Internet-Draft for Sensor Entity MIB |
Done | | Determine if the Entity MIB should be modified to resolve any
open issues |
Done | | Publish state/status extensions as a WG I-D |
Done | | Evaluate status of the Entity MIB and collect implementation
and interoperability reports |
Done | | Evaluate status of the Entity MIB and collect implementation
and interoperability reports |
Done | | Recommend to the IESG if the Entity MIB can be elevated to
Draft Standard. |
Done | | Submit the Entity MIB to the IESG for Draft Standard |
Done | | Submit Entity State MIB to the IESG for Proposed Standard |
Jun 04 | | Re-charter or shut-down the WG |