tsvwg-0----Page:3
1  2  3  4 

Changes from previous version
Addressed second round of feedback:
added a SHOULD for use of Make-Before-Break when resizing TE tunnel
added clarification text about E2E Resv hiding from Transit LSRs
added reference to [RSVP-AGG-IPSEC] in section 5
added definition of E2E reservation in section 2
removed the case where E2E reservation is a TE tunnel (already covered in [LSP-HIER])
Issued as WG document:
As per agreement at IETF62
PPT Version