Transparent interconnection of Lots of Links WG WEDNESDAY, November 9, 2005 1300-1500 Afternoon Session I Administrativia (scribe etc) Chair 5 minutes Agenda bashing Chair 5 minutes Base specifications Joe Touch 20 minutes Late drafts are at http://www.postel.org/rbridge/draft-touch-trill-rbridge-prob-00.txt http://www.postel.org/rbridge/draft-touch-trill-rbridge-arch-00a.txt Routing Requirements in Support of R-Bridges draft-gray-rbridge-routing-reqs-00.txt Eric Gray 20 minutes Multicast Link State For Rbidges draft-hares-trill-multicast-00.txt Sue Hares 20 minutes TRILL using Pseudo-Wire Emulation (PWE) Encapsulation draft-bryant-perlman-trill-pwe-encap-00.txt Stewart Bryant 20 minutes