Last Modified: 2007-08-20
| Done | First draft of architectural document | |
| Done | First draft of protocol document | |
| Done | First draft on cryptographic locators, if required | |
| Done | First draft on multi-homing triggers description | |
| Done | First draft on applicability statement document | |
| Done | WG last-call on protocol document | |
| Done | WG last-call on cryptographic locators, if required | |
| Done | WG last-call on multihoming triggers description | |
| Done | Submit document on cryptographic locators to the IESG, if required | |
| Done | Submit protocol document to the IESG | |
| Done | Submit draft on multihoming triggers description to the IESG | |
| Oct 2007 | WG last-call on architectural document | |
| Oct 2007 | WG last-call on applicability statement document | |
| Dec 2007 | Submit completed architectural document to IESG | |
| Dec 2007 | Submit applicability statement document to IESG |