•Start finalizing for last call
•
•
•Extend Framework draft to include signaling/routing for regenerators, OEO switches
–Changes are detailed in “draft-bernstein-ccamp-wson-signal-00.txt”
–Align with ITU-T terminology for optical signals: Optical Tributary Signals (G.959.1). (This terminology is also used in G.698.1 and G.698.2). Along with their parameters.
–Update routing model to include “signal
compatibility”
–