| Done | | Hold the first Working Group meeting and discuss the charter
and the state of progress on the chartered items. |
| Done | | Update the PIM-DM version 2 Internet-draft. Go to WG last call.
Submision to IESG for considerations as proposed standard. |
| Done | | Resubmit the latest PIM-SM version 2 specification to IESG for
consideration as a proposed standard RFC |
| Done | | Submit PIM-SM Applicability Statements |
| Done | | Submit PIMv2 MIB to IESG for consideration as proposed
standard. |
| Done | | Submit updated PIM-SM and PIM-DM internet-drafts, clarifying
any inconsistencies or ambiguities in the previous drafts. |
| Done | | Submit PIM-SM version 2 and PIM-DM version 2 specifications to
IESG for consideration as Draft Standards. |
| Done | | Submit PIMv2 MIB to IESG for consideration as draft standard. |
| Done | | Ratify new WG charter and milestones |
| Dec 2007 | | Submit the BSR spec as a Proposed Standard to the IESG |
| Dec 2007 | | Submit the BSR MIB as a Proposed Standard to the IESG |
| Mar 2008 | | Submit a more reliable pim solution (refresh reduction) to the
IESG |
| Mar 2008 | | Submit a generic TLV PIM Join Attribute PS draft to the IESG |
| Mar 2008 | | Submit RPF Vector (use of PIM Join Attribute) as PS to the IESG |
| Mar 2008 | | Submit a way to authenticate PIM link local messages as PS to
the IESG |
| Mar 2008 | | Submit an Informational PIM last hop threats document to the
IESG |