Meeting Minutes : LIME WG Note Well: — No Discussion — Agenda: First Talk about Yang Model Applicability Statement PM and next steps Charter : 3 Key Deliverables 1. Yang Data Model (Deepak Kumar will present) 2. Architecture 3. Applicability Document Reminder on 2nd Milestone - Architecture. Qin Wu (Huwaei) : Informed Tom is not here, so he will cover the applicability document. LIME Applicability Presentation ---- Discussion Authors : Is the docuemtn need to cover all models or cover only few of them to demonstrate LIME applicability Greg: IP, MPLS, MPLS-TP also. Carlos: Advised Authors to work with standard specific OAM Models Like BFD, IP, MPLS-TP, MPLS Greg: BFD, MPLS-TP OAM, LSP Ping might be good fit for architecture and we should talk to respective models work in l3sm working group. Performance Management Presenentation (Qin Wu Huawei) — Summary: Not all OAM support performance management so we separate from other base oam model 2 pieces are covered Loss Measurement and Delay Measurement Extend MEP - distinguish one-way to 2 way (Measurement type) session-type - (delay loss) 4 RPC are instroduced Inconsistency - abort support both on-demand and pro-active whether it’s part of base model () Discussion — Greg: LMAP working group (controller management agent and protocols to instantiate measurement, and task is ) -Define schedule - periodicity Rob Bonica - Argue with MUST wording - leave place for extension and move it later Benoit: IPPM has been doing this activity for a while and this might not be generic enough so should be taken up by respective technologies. General Discussion and Action Items ----- Deepak Kumar will take care of all the comments for Generic Yang model and push latest draft and ask for Working Group Adoption Applicability Document, OAM Architecture document Benoit: End Goal is that base model and child model of other technology has to work and this has to be demonstrated by Applicability document. ===================================================== Jabber Archive: http://www.ietf.org/jabber/logs/lime/2015-07-21.html ===================================================== Meeting Summary: • LIME met on Tuesday afternoon • Document Update: o Great progress on the LIME base YANG model o The LIME Applicability Statement needs much work o Should the LIME PM YANG model live in IPPM? o The architecture document has not started. • Key takeaways: o LIME base YANG model -> Will issue a new revision, to then have a call for adoption; needs YANG doctors review o The ultimate goal is that the abstracted base model is extended by protocols. Urgent need to connect with and rationalize MPLS-TP, LSP-PING, and BFD YANG models o Need to clarify connectivity check vs. verification • Next steps: o Post -06 for lime-base, then call for adoption o Get all authors together of Applicability with other WGs. o Start the architecture