PCE Working Group Meeting – Tuesday, July 18, 2017; 3:50-5:50 PM
1. Introduction
1.1. Administrivia, Agenda Bashing (chairs, 5 min)
1.2. WG Status (chairs, 20 min) [25/120]
2. WG’s I-Ds
2.1. PCEP Extensions for Association Groups (Dhruv Dhody, 10 min) [35/120]
draft-ietf-pce-association-group
3. New I-Ds
3.1. PCEP Extensions for Residual Bandwidth (Daniele Ceccarelli, 10 min) [45/120]
3.2. PCEP Extensions for Flexible Grid (Young Lee, 10 min) [55/120]
3.3. PCEP Extensions for Multilayer LSP Association (Fangwei Hu, 10 min) [65/120]
draft-xiong-pce-multilayer-lsp-association
3.4. PCEP Extensions for Stitching with H-PCE (Young Lee/Dhruv Dhody, 10 min) [75/120]
draft-lee-pce-lsp-stitching-hpce
4. Previously Discussed Topics
4.1. PCEP Extension for Flow Specification (Adrian Farrel, 10 min) [85/120]
4.2. PCE as Central Controller (Dhruv Dhody/Satish Karunanithi, 10 min) [95/120]
draft-zhao-pce-pcep-extension-for-pce-controller
draft-zhao-pce-pcep-extension-pce-controller-sr
draft-palle-pce-controller-labeldb-sync
4.3. PCEP for Distribution of Link State and TE (Young Lee, 10 min) [105/120]