| < draft-ietf-raw-ldacs-02.txt | draft-ietf-raw-ldacs-03.txt > | |||
|---|---|---|---|---|
| RAW N. Maeurer, Ed. | RAW N. Maeurer, Ed. | |||
| Internet-Draft T. Graeupl, Ed. | Internet-Draft T. Graeupl, Ed. | |||
| Intended status: Informational German Aerospace Center (DLR) | Intended status: Informational German Aerospace Center (DLR) | |||
| Expires: 28 April 2021 C. Schmitt, Ed. | Expires: 30 April 2021 C. Schmitt, Ed. | |||
| Research Institute CODE, UniBwM | Research Institute CODE, UniBwM | |||
| 25 October 2020 | 27 October 2020 | |||
| L-band Digital Aeronautical Communications System (LDACS) | L-band Digital Aeronautical Communications System (LDACS) | |||
| draft-ietf-raw-ldacs-02 | draft-ietf-raw-ldacs-03 | |||
| Abstract | Abstract | |||
| This document provides an overview of the architecture of the L-band | This document provides an overview of the architecture of the L-band | |||
| Digital Aeronautical Communications System (LDACS), which provides a | Digital Aeronautical Communications System (LDACS), which provides a | |||
| secure, scalable and spectrum efficient terrestrial data link for | secure, scalable and spectrum efficient terrestrial data link for | |||
| civil aviation. LDACS is a scheduled, reliable multi-application | civil aviation. LDACS is a scheduled, reliable multi-application | |||
| cellular broadband system with support for IPv6. LDACS shall provide | cellular broadband system with support for IPv6. LDACS shall provide | |||
| a data link for IP network-based aircraft guidance. High reliability | a data link for IP network-based aircraft guidance. High reliability | |||
| and availability for IP connectivity over LDACS are therefore | and availability for IP connectivity over LDACS are therefore | |||
| skipping to change at page 1, line 39 ¶ | skipping to change at page 1, line 39 ¶ | |||
| Internet-Drafts are working documents of the Internet Engineering | Internet-Drafts are working documents of the Internet Engineering | |||
| Task Force (IETF). Note that other groups may also distribute | Task Force (IETF). Note that other groups may also distribute | |||
| working documents as Internet-Drafts. The list of current Internet- | working documents as Internet-Drafts. The list of current Internet- | |||
| Drafts is at https://datatracker.ietf.org/drafts/current/. | Drafts is at https://datatracker.ietf.org/drafts/current/. | |||
| Internet-Drafts are draft documents valid for a maximum of six months | Internet-Drafts are draft documents valid for a maximum of six months | |||
| and may be updated, replaced, or obsoleted by other documents at any | and may be updated, replaced, or obsoleted by other documents at any | |||
| time. It is inappropriate to use Internet-Drafts as reference | time. It is inappropriate to use Internet-Drafts as reference | |||
| material or to cite them other than as "work in progress." | material or to cite them other than as "work in progress." | |||
| This Internet-Draft will expire on 28 April 2021. | This Internet-Draft will expire on 30 April 2021. | |||
| Copyright Notice | Copyright Notice | |||
| Copyright (c) 2020 IETF Trust and the persons identified as the | Copyright (c) 2020 IETF Trust and the persons identified as the | |||
| document authors. All rights reserved. | document authors. All rights reserved. | |||
| This document is subject to BCP 78 and the IETF Trust's Legal | This document is subject to BCP 78 and the IETF Trust's Legal | |||
| Provisions Relating to IETF Documents (https://trustee.ietf.org/ | Provisions Relating to IETF Documents (https://trustee.ietf.org/ | |||
| license-info) in effect on the date of publication of this document. | license-info) in effect on the date of publication of this document. | |||
| Please review these documents carefully, as they describe your rights | Please review these documents carefully, as they describe your rights | |||
| skipping to change at page 32, line 4 ¶ | skipping to change at page 32, line 4 ¶ | |||
| CPDLC Controller Pilot Data Link Communication | CPDLC Controller Pilot Data Link Communication | |||
| DT Nominal Time value for RSP | DT Nominal Time value for RSP | |||
| ET Operational Time value for RCP | ET Operational Time value for RCP | |||
| FH Flight Hour | FH Flight Hour | |||
| MA Monitoring and Alerting criteria | MA Monitoring and Alerting criteria | |||
| OT Operational Time value for RSP | OT Operational Time value for RSP | |||
| RCP Required Communication Performance | RCP Required Communication Performance | |||
| RSP Required Surveillance Performance | RSP Required Surveillance Performance | |||
| TT Nominal Time value for RCP | TT Nominal Time value for RCP | |||
| +--------------+---------------+ | +========================+=============+=============+ | |||
| | | ECP 130 | | | | ECP 130 | ECP 130 | | |||
| +--------------+-------+-------+ | +========================+=============+=============+ | |||
| | Parameter | ET | TT95% | | | Parameter | ET | TT95% | | |||
| +--------------+-------+-------+ | +------------------------+-------------+-------------+ | |||
| | Transaction | 130 | 67 | | | Transaction Time (sec) | 130 | 67 | | |||
| | Time (sec) | | | | +------------------------+-------------+-------------+ | |||
| +--------------+-------+-------+ | | Continuity | 0.999 | 0.95 | | |||
| | Continuity | 0.999 | 0.95 | | +------------------------+-------------+-------------+ | |||
| +--------------+-------+-------+ | | Availability | 0.989 | 0.989 | | |||
| | Availability | 0.989 | | +------------------------+-------------+-------------+ | |||
| +--------------+---------------+ | | Integrity | 1E-5 per FH | 1E-5 per FH | | |||
| | Integrity | 1E-5 per FH | | +------------------------+-------------+-------------+ | |||
| +--------------+---------------+ | ||||
| Figure 5: CPDLC Requirements for ECP | Table 1: CPDLC Requirements for ECP | |||
| +--------------+--------------------+---------------+ | +==============+==========+==============+=========+=========+ | |||
| | | RCP 240 | RCP 400 | | | | RCP 240 | RCP 240 | RCP 400 | RCP 400 | | |||
| +--------------+----------+---------+-------+-------+ | +==============+==========+==============+=========+=========+ | |||
| | Parameter | ET | TT95% | ET | TT95% | | | Parameter | ET | TT95% | ET | TT95% | | |||
| +--------------+----------+---------+-------+-------+ | +--------------+----------+--------------+---------+---------+ | |||
| | Transaction | 240 | 210 | 400 | 350 | | | Transaction | 240 | 210 | 400 | 350 | | |||
| | Time (sec) | | | | | | | Time (sec) | | | | | | |||
| +--------------+----------+---------+-------+-------+ | +--------------+----------+--------------+---------+---------+ | |||
| | Continuity | 0.999 | 0.95 | 0.999 | 0.95 | | | Continuity | 0.999 | 0.95 | 0.999 | 0.95 | | |||
| +--------------+----------+---------+-------+-------+ | +--------------+----------+--------------+---------+---------+ | |||
| | Availability | 0.989 (safety) | 0.989 | | | Availability | 0.989 | 0.989 | 0.989 | 0.989 | | |||
| | | 0.9899 (efficiency)| | | | | (safety) | (efficiency) | | | | |||
| +--------------+--------------------+---------------+ | +--------------+----------+--------------+---------+---------+ | |||
| | Integrity | 1E-5 per FH | 1E-5 per FH | | | Integrity | 1E-5 per | 1E-5 per FH | 1E-5 | 1E-5 | | |||
| +--------------+--------------------+---------------+ | | | FH | | per FH | per FH | | |||
| +--------------+----------+--------------+---------+---------+ | ||||
| Figure 6: CPDLC Requirements for RCP | Table 2: CPDLC Requirements for RCP | |||
| RCP Monitoring and Alerting Criteria in case of CPDLC: | RCP Monitoring and Alerting Criteria in case of CPDLC: | |||
| - MA-1: The system shall be capable of detecting failures and | - MA-1: The system shall be capable of detecting failures and | |||
| configuration changes that would cause the communication service | configuration changes that would cause the communication service | |||
| no longer meet the RCP specification for the intended use. | no longer meet the RCP specification for the intended use. | |||
| - MA-2: When the communication service can no longer meet the RCP | - MA-2: When the communication service can no longer meet the RCP | |||
| specification for the intended function, the flight crew and/or | specification for the intended function, the flight crew and/or | |||
| the controller shall take appropriate action. | the controller shall take appropriate action. | |||
| +------------+---------------+--------------------+---------------+ | +==============+=====+=====+==========+==============+======+=======+ | |||
| | | RSP 160 | RSP 180 | RSP 400 | | | | RSP | RSP | RSP 180 | RSP 180 | RSP |RSP 400| | |||
| +------------+-------+-------+----------+---------+-------+-------+ | | | 160 | 160 | | | 400 | | | |||
| | Parameter | OT | DT95% | OT | DT95% | OT | DT95% | | +==============+=====+=====+==========+==============+======+=======+ | |||
| +------------+-------+-------+----------+---------+-------+-------+ | | Parameter | OT |DT95%| OT | DT95% | OT | DT95% | | |||
| | Trans- | | | | | | | | +--------------+-----+-----+----------+--------------+------+-------+ | |||
| | action | 160 | 90 | 180 | 90 | 400 | 300 | | | Transaction | 160 | 90 | 180 | 90 | 400 | 300 | | |||
| | Time (sec) | | | | | | | | | Time (sec) | | | | | | | | |||
| +------------+-------+-------+----------+---------+-------+-------+ | +--------------+-----+-----+----------+--------------+------+-------+ | |||
| | Continuity | 0.999 | 0.95 | 0.999 | 0.95 | 0.999 | 0.95 | | | Continuity |0.999| 0.95| 0.999 | 0.95 |0.999 | 0.95 | | |||
| +------------+-------+-------+----------+---------+-------+-------+ | +--------------+-----+-----+----------+--------------+------+-------+ | |||
| | Avail- | 0.989 | 0.989 (safety) | 0.989 | | | Availability |0.989|0.989| 0.989 | 0.989 |0.989 | 0.989 | | |||
| | ability | | 0.9899 (efficiency)| | | | | | | (safety) | (efficiency) | | | | |||
| +------------+---------------+--------------------+---------------+ | +--------------+-----+-----+----------+--------------+------+-------+ | |||
| | Integrity | 1E-5 per FH | 1E-5 per FH | 1E-5 per FH | | | Integrity | 1E-5| 1E-5| 1E-5 per | 1E-5 per FH | 1E-5 | 1E-5 | | |||
| +------------+---------------+--------------------+---------------+ | | | per | per | FH | |per FH| per FH| | |||
| | | FH | FH | | | | | | ||||
| +--------------+-----+-----+----------+--------------+------+-------+ | ||||
| Figure 7: ADS-C Requirements | Table 3: ADS-C Requirements | |||
| RCP Monitoring and Alerting Criteria: | RCP Monitoring and Alerting Criteria: | |||
| - MA-1: The system shall be capable of detecting failures and | - MA-1: The system shall be capable of detecting failures and | |||
| configuration changes that would cause the ADS-C service no longer | configuration changes that would cause the ADS-C service no longer | |||
| meet the RSP specification for the intended function. | meet the RSP specification for the intended function. | |||
| - MA-2: When the ADS-C service can no longer meet the RSP | - MA-2: When the ADS-C service can no longer meet the RSP | |||
| specification for the intended function, the flight crew and/or | specification for the intended function, the flight crew and/or | |||
| the controller shall take appropriate action. | the controller shall take appropriate action. | |||
| End of changes. 10 change blocks. | ||||
| 52 lines changed or deleted | 54 lines changed or added | |||
This html diff was produced by rfcdiff 1.48. The latest version is available from http://tools.ietf.org/tools/rfcdiff/ | ||||